Mon–Fri 9:00–18:00 · online 24/7

Construction

Design

Equipment

Company

Client account

Submit requests, track their status, and receive estimates and contracts online.

Sign in or register +7 (727) 972 30 30

Since 1994

About the Company

A full-cycle general contractor: we design, build and hand over industrial, civil and private projects across Kazakhstan since 1994.

32years in the Kazakhstan market
7completed projects in our portfolio
12projects under construction now
3offices: Almaty, Astana, Taraz

First Construction Company LLP (FCC) is a design and construction company acting as general designer and general contractor. We manage a project end to end: from pre-design work and design to construction and commissioning.

since 1994of our team's construction experience
37+completed projects
full cyclegeneral designer and general contractor

Our strength lies in departments staffed with qualified specialists, a sufficient workforce across all construction trades, utility network specialists and our own equipment and material base. This lets us carry out most of the work in-house, maintain quality and offer competitive prices.

What we do

Design

  • surveys of buildings, structures and utility networks;
  • architectural, structural and process engineering solutions;
  • architectural concepts and scale models;
  • design, approvals and state expert review.

Construction

  • earthworks and foundations, structural frame;
  • finishing, renovation, reconstruction, facades, roofing;
  • internal and external utility networks;
  • elevators, moving walkways and other lifting equipment;
  • landscaping, greenery, small architectural forms;
  • roads, bridges, overpasses, parking lots;
  • commissioning and handover.

Utility networks include power, water, gas and heat supply, telephone and television, fire suppression, security alarms, automated power metering (ASKUE) and dispatch control. When building roads, we also install special equipment such as traffic lights. Learn more in the "Services" section.

Experience

Our team has completed more than 37 design, construction and reconstruction projects, including the restoration of cultural heritage sites — with full utility infrastructure and site landscaping. See examples in the "Projects" section.

Support with approvals We work closely with municipal approval authorities and power supply companies and help the client obtain technical specifications, approve the design and pass expert review, build and connect utility networks and put the facility into operation.

The company takes part in tenders for the construction of major facilities, for the restoration of cultural heritage monuments adapted for modern use, as well as tenders for commercial projects.

We have adopted the best of accumulated construction practice, including the experience of our foreign colleagues, and are open to cooperation in new construction and design.

Company details

NameFirst Construction Company LLP
AddressAlmaty, 498 Seifullin St., office 202
BIN130440002581
OKED41201 — construction of residential buildings
OKPO51974755
KATO7517100001
KBe17
Bank accountKZ54319A010006316283
BankAlmaty branch of BTA Bank JSC, Almaty
BICABKZKZKX

Draw on FCC's experience Tell us about your project — we will propose a solution and a timeline.

Contact us

Why clients trust us

Full cycle

Surveys, design, estimate, construction and handover — one contract and one point of responsibility.

Own equipment

The company's own cranes, dump trucks and special machinery: we don't depend on third-party schedules.

Transparency

Estimates, contracts, certificates and photo reports — in the client's personal account.

Deadlines in the contract

A schedule with milestones and payment for completed stages.

Nationwide

Offices in Almaty, Astana and Taraz, projects across Kazakhstan.

Seismicity and climate

We design and build with the site's seismicity and the sharply continental climate in mind.

History

Company history

  1. 1994

    Company founded

    First Construction Company LLP starts operating as a general contractor in civil construction.

  2. 2021

    Sports complex

    Completed: Taraz.

  3. 2022

    Workers' camp for 400 people

    Completed: Atyrau.

  4. 2023

    Class B+ business center; Reconstruction of a 14 km highway

    Completed: Astana, Taraz.

  5. 2024

    Steel structures fabrication shop; 1 MW solar power plant

    Completed: Astana, Taraz.

  6. 2025

    Warehouse complex with cold storage chambers

    Completed: Shymkent.

  7. 2026

    Client personal account

    Requests, estimates, contracts, photo reports and work status — online at fcco.kz.

32years in the construction market
3offices: Almaty, Astana, Taraz
4business lines: construction, design, equipment, renovation

Geography

We work across Kazakhstan

Almaty Astana Taraz Atyrau Shymkent Karaganda

Projects by city

Click a city to see its projects.

Almaty4 Astana4 Taraz5 Atyrau2 Shymkent2 Karaganda2

Testimonials

What our clients say

All testimonials Leave a review
Pharmaceutical warehouses are subject to the strictest requirements for temperature control, ventilation and cleanliness. The First Construction Company team proved its outstanding professionalism already at the design stage, taking into account all GDP standards and certification requirements. Construction was completed exactly on the agreed date. The air conditioning system, dust-free floors, insulation — everything was done flawlessly. We are planning to expand our branch network next year, and we will definitely work only with them.

Project: 4,800 m² pharmaceutical distribution center (GSP/GDP), design and construction

АС Арман СейтказиевChief Operating Officer, ТОО «ФармЛогистик Казахстан»
This is our first time working with First Construction Company; we chose them as the general contractor for a new workshop and the installation of a production line. What particularly pleased us was competent technical supervision and clear coordination of subcontractors. They met the schedule to the day, which is critical for manufacturers, since the equipment was supplied under a contract with strict commissioning dates. The quality of the steel structures and connection joints is excellent. We will come back to them for the second phase of the project.

Project: Production workshop and supervised installation of a metalworking line

ВИ Владимир Ильич КовалевGeneral Director, ТОО «ПромТехДеталь»
Working with First Construction Company is convenient and reliable. They took on the project from the zero cycle and carried it through to acceptance by the state commission. The company's engineering staff promptly resolved any technical issues on the construction site, reporting was transparent, and concrete and rebar deliveries ran without interruption. The building was handed over without any comments from the regulatory authorities or technical supervision. True professionals, and we count on a long-term partnership.

Project: General contracting: 12-storey residential building with underground parking

БЖ Бахытжан ЖумабековConstruction Director of an investment and construction group
Huge thanks to the specialists of First Construction Company for our dream home! We ordered both the architectural design and the turnkey construction. All estimates were fixed from the start, and no unexpected overpayments came up along the way. The builders were neat, and the foreman was always available and sent photo reports of every stage — from the foundation to the roof. The quality of the masonry and concrete work is top-notch. We have already recommended the company to our friends!

Project: Custom design and turnkey construction of a 380 m² cottage

СИ Сергей и Елена Морозовы
For a logistics hub, the key factors are the quality of industrial floors (flatness for reach trucks), a reliable roof and a properly organized dock area. The specialists of First Construction Company met all the requirements to European standards. The warehouse has been operating at full load for six months now — no defects or settlement. When building the next phases of the hub, the choice of contractor is obvious to us.

Project: Class A logistics terminal with high-bay storage, 8,500 m²

КУ Канат УсеновHead of the Warehouse Logistics Department
Food production requires a special approach to finishing materials, drainage gullies and supply and exhaust ventilation. The engineers of First Construction Company skillfully integrated the equipment process chain with the building structures. The work was done quickly, cleanly and to a high standard. It is a pleasure to work with a company that listens to the client and solves problems of any complexity. We will cooperate on an ongoing basis.

Project: Food production building with clean rooms

ГА Гульнара АхметоваCo-owner of a confectionery factory

PDF · 2026

Company presentation

Services, projects, key figures and office contacts: easy to forward to management or attach to tender documents.

By clicking the button, you agree to the privacy policy.

Request

Tell us about your project

We will prepare a preliminary estimate and timeline. If you are registered, you can track the request status in your account.

We reply within one business day
Call WhatsApp