Mon–Fri 9:00–18:00 · online 24/7

Construction

Design

Equipment

Company

Client account

Submit requests, track their status, and receive estimates and contracts online.

Sign in or register +7 (727) 972 30 30

Administrative and Amenity Building of an Oilfield Service Base

A three-storey administrative and amenity building for 250 employees: offices, changing rooms with workwear drying, a canteen, a first-aid station. Construction on a rotational basis.

Administrative and Amenity Building of an Oilfield Service Base

A three-storey administrative and amenity building of an oilfield service base in Atyrau Region for 250 workers: offices for engineering services, a control room, changing rooms and showers with workwear drying, a canteen and a first-aid station. We are building it on a turnkey basis using a rotational work schedule.

2,900 m²building area
250 peoplebase staff
120 seatsin the canteen
Q1 2027planned completion

The client's objective

The base needs a building where staff can change clothes, dry their workwear, eat and receive medical care, and where engineering services can work in proper offices. The site is remote, with challenging natural conditions.

Site conditions and solutions

  • saline soils — foundations with protection of concrete against an aggressive environment;
  • summer heat and strong winds — reinforced fixing of the building envelope;
  • changing rooms and showers with workwear drying for a shift of 250 people;
  • a 120-seat canteen and a first-aid station;
  • rotational work schedule: crews live at the company's existing rotational camp.

Aggressive soils The saline soils of Atyrau Region destroy unprotected concrete and reinforcement. Protection is built in at the design level: concrete mix, waterproofing and anti-corrosion measures.

What has been done and what is ahead

  1. Start Work began in March 2026.
  2. Foundations Foundations protected against an aggressive environment.
  3. Current stage The steel frame has been erected, and floor slabs and wall cladding are being installed.
  4. Ahead Roof, building services, drying rooms and showers, fitting out the canteen and first-aid station.
  5. Handover Finishing and commissioning in Q1 2027.

Result

The base staff will get a modern building with all amenities, designed for the local climate. We have experience in the region: in Atyrau Region we built a rotational camp for 400 people — it is featured in the Projects section.

Similar projects

Request

Tell us about your project

We will prepare a preliminary estimate and timeline. If you are registered, you can track the request status in your account.

We reply within one business day
Call WhatsApp