Mon–Fri 9:00–18:00 · online 24/7

Construction

Design

Equipment

Company

Client account

Submit requests, track their status, and receive estimates and contracts online.

Sign in or register +7 (727) 972 30 30

Kindergarten for 320 Children

A two-storey kindergarten for 16 groups with a swimming pool, music and sports halls, a kitchen and outdoor play areas.

Kindergarten for 320 Children

A kindergarten for 320 children for the new residential district of Nura in Astana. The two-storey building for 16 groups with a swimming pool, music and sports halls, a medical unit and a full-cycle kitchen is being built by us on a turnkey basis under a government contract.

320 places16 group units
5,600 m²building area
2 storeysframe and cast-in-place building
Q2 2027planned completion

Objective

The new district needs a kindergarten that meets current sanitary standards: group units with separate bedrooms, a swimming pool, activity halls, a medical unit and its own kitchen. For a social facility, safety, accessibility and economical operation in the Astana climate are important.

Solutions

  • a cast-in-place frame building with aerated concrete infill and an insulated facade;
  • ventilation with heat recovery — fresh air without high heating costs in winter;
  • heating and water treatment for the swimming pool;
  • barrier-free environment: ramps, a lift, accessible toilets for people with limited mobility;
  • outdoor play areas with shade canopies and safe surfacing.

Heat recovery In Astana in winter, ventilation without heat recovery is one of the largest sources of heat loss in a building. A heat recovery unit returns part of the heat from the exhaust air to the supply air and reduces heating costs.

What has been done and what is ahead

  1. Start Work began in February 2026.
  2. Frame The building frame has been completed.
  3. Current stage Wall masonry and roof installation are under way, and installation of internal utility networks has begun.
  4. Ahead Facade, ventilation and swimming pool, finishing, fitting out the kitchen and medical unit.
  5. Landscaping and handover Outdoor play areas with canopies, commissioning in Q2 2027.

Result

The district will get a modern kindergarten with a swimming pool and an accessible environment. Learn more about social facilities — civil construction.

Similar projects

Request

Tell us about your project

We will prepare a preliminary estimate and timeline. If you are registered, you can track the request status in your account.

We reply within one business day
Call WhatsApp