Comfort-Class Residential Complex with 216 Apartments

Two 14-storey buildings with underground parking and commercial premises on the ground floor. Cast-in-place frame, ventilated facade, a car-free landscaped courtyard.

Comfort-Class Residential Complex with 216 Apartments

A comfort-class residential complex in the Yesil District of Astana: two 14-storey buildings with 216 apartments, underground parking and commercial premises on the ground floors. We act as the general contractor — from excavation to commissioning.

216 apartments2 buildings of 14 storeys
18,400 m²complex area
140 spacesunderground parking
Q4 2027planned completion

Objective

To build comfort-class housing with a car-free courtyard, underground parking and ground-floor retail. In Astana the key issues are thermal protection, energy-efficient heating and keeping to the schedule given the long winter.

Structure and solutions

  • a cast-in-place reinforced concrete frame on a raft foundation;
  • an insulated ventilated facade with porcelain stoneware — for the harsh Astana winter;
  • individual heating substations and per-apartment heat metering — residents pay for actual consumption;
  • underground parking for 140 cars;
  • a car-free courtyard: children's and sports playgrounds, greenery.

Winter concreting To avoid stopping work on the frame during the cold season, work follows a calendar schedule with winter concreting: heating, enclosures and monitoring of concrete strength gain.

What has been done and what is ahead

  1. Excavation and underground part Work began in September 2025: excavation, raft foundation, parking.
  2. Current stage The cast-in-place frame of the above-ground part is being erected, while external wall masonry is under way on the lower floors in parallel.
  3. Ahead — facades and building services Ventilated facade, heating substations, internal networks, lifts.
  4. Landscaping and handover Courtyard with playgrounds and greenery, commissioning in Q4 2027.

Result

Combining frame work and masonry makes it possible to keep to the schedule. Learn more about our approach — civil construction, and see other projects in our portfolio.